6.3 Auxiliary Powerhouse

    6.3.1 Arrangement of auxiliary powerhouse shall be determined based upon the overall project planning and combined withgeneral layout conditions. The auxiliary powerhouse of a surfacepowerhouse may be built at upstream side,downstream side orany end of th...[繼續閱讀]

水利水電工程機電設計

6.4 Main Transformer

    6.4.1 For surface powerhouse,main transformers should bearranged adjacent to the main powerhouse in consideration ofsuch factors as ventilation and heat radiation,high and low voltage leads,fire-fighting,operation and maintenance,staged construction,spray...[繼續閱讀]

水利水電工程機電設計

6.5 High Voltage Switchgear

    6.5. 1 Arrangement of high voltage switchgear shall be selectedby technical and economic comparisons on the basis of generallayout,incoming and outgoing lines,local environment conditions,terrain and topographical features,in the principle of lessspace,le...[繼續閱讀]

水利水電工程機電設計

6.6 Central Control Room

    6.6. 1 The location of the central control room for surface powerhouse shall be in accordance with the following requirements:1 It shall be convenient for operation,maintenance andmanagement,facilitate the stage transition and save cable. Itshall avoid or...[繼續閱讀]

水利水電工程機電設計

6.7 Other Auxiliary Room

    6.7. 1 Computer room should be located near the central control room,and its environment conditions shall meet the relevantstandards.6.7.2 Relay protection and auxiliary panel should be arrangedin the room adjacent to central control room,or may be arrang...[繼續閱讀]

水利水電工程機電設計

6.8 Diversion System in a Hydropower Plant

    6.8.1 Head loss of diversion system in a hydropower plantshould not be excessive and shall satisfy the stable operation design requirements for unit regulation guarantee,starting up,synchronization and load regulation. Diversion system itself shallnot cau...[繼續閱讀]

水利水電工程機電設計

6.9 Water Conveyance System in Pumping Station

    6.9. 1 The type of inlet and outlet water passages of a pumpingstation shall be determined by technical and economic comparisons according to such factors as pumping station head,pumptype and water level variation range of the outlet pool etc. For alarge-...[繼續閱讀]

水利水電工程機電設計

6.10 Elevator

    6. 10. 1 The hydropower plants/pumping stations meeting oneof the following conditions should be equipped with elevator:1 Where the height difference between floors is over 20mfor main powerhouse,auxiliary powerhouse and switchgearroom.2 Where the height ...[繼續閱讀]

水利水電工程機電設計

7.1 Workshop

    7.1. 1 The mechanical workshop shall be set according to suchfactors as management mode,E&M equipment maintenancescope of the hydropower station or pumping station,the role ofhydropower plant in the power grid,transportation,cooperationwith other fact...[繼續閱讀]

水利水電工程機電設計

7.2 Electrical Laboratory

    7.2.1 The electrical laboratory should be provided for the hydropower plants and pumping stations.7.2.2 The electric instruments shall be furnished according toplant/station scale,characteristics of permanent equipment,management mode and geographical loc...[繼續閱讀]

水利水電工程機電設計
科普知識
心理健康 優生優育 休閑旅游 健身美容 飲食健康 人與自然 地球家園 海洋技術 科海拾貝 科學之迷 科技前沿 科技史話 科幻未來 神話傳說 童話故事 致富指南 農用物資 生物技術 畜牧獸醫 園林花卉 特產養殖 營養早餐 減肥晚餐 晚餐食譜 營養晚餐 減肥中餐 中餐文化 中餐菜譜 中餐營養 健康早餐 減肥早餐 早餐食譜 晚餐禁忌 寶石鑒定 安全生產 安裝鉗工 鈑金技術 寶石觀察 焙烤工業 變性淀粉 插花技能 車工技術 道路工程 低壓電器 電氣工程 電氣設備 電網工程 電源技術 電站工程 淀粉科學 調味配方 發電節能 防水材料 飛機飛行 服裝生產 鋼鐵材料 工程建設 工業工程 公路工程 管道工程 罐頭工業 國際組織 國家電網 華北電網 火電工程 貨運物流 機床設計 機電工程 機修鉗工 基本資料 家用電器 建設工程 節約用電 金銀技術 金屬材料 連續鑄鋼 輪機工程 奶牛養殖 農村電工 配電技術 皮革工業 啤酒工業 蘋果產業 鉗工簡明 青工車工 青年審美 肉類工業 入侵檢測 食品科學 世界修船 獸醫獸藥 水下工程 稅收制度 通信設備 統計公文 土木工程 維修電工 味精工業 文物鑒賞 物業電工 銑工計算 線損管理 鞋楦設計 煙草工業 鹽業產品 冶金產品 液壓技術 印刷科技 用電管理 油墨技術 軋鋼技術 粘接技術 照明設計 制漿造紙 土元養殖 兔場疾病 外國美術